Simple construction: step by step

You receive a pallet with all the materials needed for construction: structural beams and screws.

Before setting up the structure, we need to have a prepared concrete slab.

Work time: ~1 hour

First, we lay out the foundation beams

to create a base for the structure.

Work time: ~30 minutes

Assembling the frame is incredibly simple.

Just put it together and screw it with the provided screws.
The longest frame element weighs 13 kg.

Work time: ~1 hour

After assembling all 11 frames, we set them upright.

The entire frame, once assembled, weighs 103 kg, and it takes 2 people to stand it up.
Once in position, we connect them with top beams.

Work time: ~24 hours

After assembling the structure, we move on to closing the structure with OSB boards.

Work time: ~2 months

We add the facade, roof, windows, doors, and connect the plumbing, electricity, etc.

Total work time: ~2 – 3 months

Voila! You can move in and arrange the interior as you like!

Wybierz model dla siebie

Wybierz szkielet i postaw dom samemu bez dźwigu, bez ekipy budowlanej, bez ciężkiego transportu.

HIY 30m2 Ireland
HIY 30m2 Ireland
A house with an internal usable area of 30 m² (building footprint of 40 m²).
12000,00 
gross
9756,10 
net
See more
HIY 55m2 Ireland
HIY 55m2 Ireland
A house with an internal usable area of 55 m² (building footprint of 70 m²).
15000,00 
gross
12195,12 
net
See more
HIY 70m2 Ireland
HIY 70m2 Ireland
A house with an internal usable area of 70 m² (building footprint of 87 m²).
19000,00 
gross
15447,15 
net
See more
Custom order
Our designers will create a structure
tailored to your needs.
See more

Find Contractors

Our design has been created so that you can easily assemble it yourself using the provided instructions and basic tools. However, if you prefer, you can hire a professional construction team to quickly and efficiently assemble the structure for you.

It all depends on your preferences and needs – the choice is yours!